Seagreen Onshore Cables


MHB provided support to BAM during the Front End Engineer Design (FEED) and Early Contractor Involvement (ECI) stages for the onshore cable works from Carnoustie to Tealing sub-station, a distance of approximately 11 miles.

This work included:

  • Topo and UAV Surveys.
  • Detailed design of the cable route and associated haul roads, storage areas and compounds.
  • Specification of required Geotechnical Investigation works and testing.
  • Specification of required Horizontal Directional Drilling (HDD).
  • Design intent and Detailed Route Design Documentation.
  • Construction drawings and specifications.

Client – BAM Nuttall