Clyde Viaduct (Glasgow Central)

This was a £13m contract to renovate the railway bridge over the River Clyde on the approaches to Glasgow Central Station. The 200-metre-long structure took two years to refurbish with the main tasks including blast cleaning, inspection and condition led steel repairs followed by repainting the bridge in its existing colour scheme.

MHB services included: Site inspections, Structural assessments, Design of condition led repairs

Temporary works designs

The project was completed in early 2022.

Client Taziker Industrial